My name is Bill Hirt and I'm a candidate to be a Representative from the 48th district in the Washington State legislature. My candidacy stems from concern the legislature is not properly overseeing the WSDOT and Sound Transit East Link light rail program. I believe East Link will be a disaster for the entire eastside. ST will spend 5-6 billion on a transportation project that will increase, not decrease cross-lake congestion, violates federal environmental laws, devastates a beautiful part of residential Bellevue, creates havoc in Bellevue's central business district, and does absolutely nothing to alleviate congestion on 1-90 and 405. The only winners with East Link are the Associated Builders and Contractors of Western Washington and their labor unions.

This blog is an attempt to get more public awareness of these concerns. Many of the articles are from 3 years of failed efforts to persuade the Bellevue City Council, King County Council, east side legislators, media, and other organizations to stop this debacle. I have no illusions about being elected. My hope is voters from throughout the east side will read of my candidacy and visit this Web site. If they don't find them persuasive I know at least I tried.

Thursday, April 24, 2025

Downtown Redmond Light Rail Extension

The Downtown Redmond Light Rail Extension, the Seattle Times heralded with a January 31 Traffic Lab article as, “A pair of new light rail stations the May 10th opening with fan fair”, will be the next Sound Transit ST3 extension to debut. 

The 3.4-mile extension from the Redmond Technology Station(RTS)  to downtown Redmond Transit Center (RTC) adds 6.8 miles to the current 13.2-mile Starter Line round trip to-and-from South Bellevue T/C.   Sound Transit budgets light rail cars at ~$30 per mile. Thus, a 2-car train to-and-from RTS tp RTC will add ~$400 to the   ~$800 current Starter Line round trip cost.   

 

Maintaining the current schedule, trains every 10 minutes from 5:30 a.m.to 9:30 p.m,  requires 96 round trips adds ~$38,400 to the current  ~$76,800 for a total $113,200 weekday cost for Starter Line operation.  The Sound Transits “Ridership—Ridership” March reported 2476 average weekday boardings for the current Starter Line route.  Assuming all the boardings resulted in $3.00 fares for ~$7500 daily fare box revenue, and a fare box recovery of ~10%.  The Downtown Redmond extension costs wlll reduce the farebox recovery for those for current Startline boardings to ~6.6%. 

 

Even those numbers don’t reflect the true fare box recovery since many riders fail to pay the $3.00 fare. For example,  the 4th Quarterly Financial Report for  2024 reported the 29,518,000 riders only paid $38,933,000 fare money or $1.32 per rider.  While it’s not clear how many of those not paying were Starter Line boarders, the actual RTS to South Bellevue P&R farebox recovery was well below Sound Transit supposed”targets”. 

 

The farebox recovery also depends on how many commuters will walk to the downtown RTC or drive to the 1200-stall Marymore P&R for the light rail ride to Bellevue  T/C or South Bellevue P&R.  Commuters currently have access to King County Metro’s RapidRide B.  Its routed from Redmond Transit Center (RTC) through Redmond Technology Station (RTS) to Bellevue Transit Center (BTC), 

 

The RabidRide  route from RTC-to-RTS provides 10 scheduled stops for access with 3 in Redmond and several along 148th Ave.  The improved access wirth added stops requires 15 minutes for the route.  That adds to the 23 minutes from RTS to Bellevue T/C on RapidRide compared to the current 13 minutes on the Starter Line schedule.

 

The bottom line is the Downtown Redmond light rail extension debut later this year will demonstrate whether shorter travel times outweigh the lack of access for commuters into Bellevue.  The 2024 Starter Line ridership results show it didn’t, likely reaffirming the folly of another ST3 extension.  

Saturday, April 19, 2025

System Expansion Committee Incompetence

The previous post on this blog concluded the Seattle Times Traffic Lab should not abide Sound Transit getting billions in 75-year bonds to fund the ST3 light rail spine along the I-5 corridor.  This post concludes  the video of the April 10th System Expansion Committee exposes why they shouldn’t increase funding for West Seattle and Ballard portions of ST3 with  Resolution No. R2025-10,

The meeting agenda included increasing the budget to advance West Seattle extension from Preliminary Engineering to Final Design Phase from $270,340,862 to $331,740,863 and the adopted 2025 budget from $94,926,236 to $99,998,561.  The Ballard Link budget was increased from $806,619,999 to $814,019.999 and the adopted 2025 budget from $96,298,561 to 99,998,561.

The money funded Project Management Support Services (PMSS) and Engineering Design Support (Eds) for light rail from West Seattle across 2nd Duwamish Waterway bridge to SODO and from Ballard though 2nd tunnel also to SODO.  They were Sound Transit’s attempts to reduce the eventual cost of both extensions and were unanimously approved by the System Expansion Committee.

While the funding for Eds to reduce the costs seemed normal, it wasn’t clear why the PMSS.  However, no one on the committee questioned why the costs had increased nearly $49 million from the 2025 Sound Transit “Adopted Budget and Financial Plan” they ‘d just adopted in March.  

One PMSS function could have been reviewing the justification for implementing the light rail extensions from Ballard and West Seattle to SODO. While they had been included in Prop 1 approval, the ST3 costs had increased from $54 billion in 2016 to $150 billion, surely merited some review.

The 2024 debut of the Starter Line and Lynnwood extension demonstrated another ST3 problem: access to light rail trains doesn’t assure ridership. 70,000 residents live within a mile of Starter Line stations and 80,000 within a mile of the Lynnwood Link stations.  Yet, in March only 1238 average inbound and outbound riders rode Starter Line and 6643 riders used Lynnwood stations for access to light rail.  Most of the Lynnwood boarders were former bus riders whose routes were terminated at one of the stations. 

Thus, any PMSS spending should consider whether riders added by light rail from Ballard to SODO or Alaska Junction in West Seattle to SODO would justify the cost of boring a second tunnel or second Duwamish Waterway bridge.   Especially since both areas already have excellent service from RapidRide, or other King or Snohomish County bus routes.  Bus routes have the advantage of having far more stops for access on the route into Seattle with far more convenient stops in the city.

The bottom line is the increasing cost of  Ballard and West Seattle light rail to SODO and the lack of Lynnwood Link and Starter Line riders justify the need for a PMSS study of those ST3 projects that could really cut costs. The April 10th System Expansion Committee approval of Resolution No. R2025-10 without it typifies their incompetence.

Saturday, April 12, 2025

Seattle Times Continues Enabling ST3 Debacle



Tuesday, April 8, 2025

July 25th Closure Biggest Benefit

The April 3rd Traffic Lab article “State shifts plan on Ship Canal Bridge project” details plans to use the results for 20% of the bridge to make a more accurate estimate for repairing the rest.  That “in the end we will have a safe, reliable bridge years to come”. 

Apparently willing to accept the July 25th four-week closure and “Many of the quarter-million-daily car trips on I-5 cancelled, detoured or delayed during summer work”.  Southbound I-5 express lanes closed and complete I-5 closure from I-90 to University District during July 26-27 and August 23-24 weekends. That “fixing 900 feet this year avoids depleting near-term budgets”.

Yet very few details about how they intend to accommodate all those car trips with 2 northbound I-5 GP lanes and southbound I-5 express lanes closed for demonstration.   Forcing southbound I-5 express lane vehicles to use GP lanes could double travel times for the 15-mile Lynnwood-to- Seattle morning commute.   

Sound Transit’s light rail route from Lynnwood to Westlake will provide part of the capacity needed.   This year’s closure precedes any transit capacity benefits from routing Line 2 light rail trains from Bellevue to Lynnwood.  Sound Transit’s decision to use light rail trains to replace bus routes minimizes any potential light rail benefits.

The bottom line is the biggest benefit of the July 25 closure is it demonstrates the lack of light rail train ridership along spine requires a need to dramatically increase bus capacity into Seattle.  Sound Transit, King County Metro, and Snohomish Community Transit need to add ST500 routes, RapidRide E routes and CT 400 bus routes along the entire corridor into Seattle.

Sunday, March 30, 2025

Why Dow Constantine for ST CEO

The March 28th Seattle Times Traffic Lab article, Constantine confirmed Sound Transit chief Executive picked as new Sound Transit Leader” is hardly a surprise.  It’s not that his tenure as Sound Transit Board member and Chair has demonstrated any competence regarding public transit.  The more likely reason being those making the selection recognized Constantine would continue to pursue the Board’s “Fantasy Lind” approach to public transit.

 

That Constantine as CEO will continue abetting a decade of transit board failure to understand what constitutes effective public transit. That public transit’s goal should be to provide transit for those unable or unwilling to drive in sufficient numbers to reduce congestion for those that do drive. Any potential CEO with a modicum of transit system competence would recognize 4-car light rail trains can’t accommodate enough transit riders to reduce multilane freeway peak hour congestion and cost too much to operate off-peak.

 

Neither the Board nor Constantine recognize additional bus routes along restricted access lanes into Seattle could provide the capacity needed for peak hour congestion and flexibility to meet off-peak congestion operating costs.  That money spent extending light rail could have been spent adding parking with access to bus stations or local routes from where commuters live to bus stations.

 

Again, any potential CEO with a modicum of transit system competence would recognize Sound Transit should not have extended light rail beyond UW Stadium across I-90 Bridge, or beyond SeaTac Airport.  At this point limiting damage require ending light rail spine to Everett and Tacoma.  Yet Constantine was selected because of his support for the spine 

 

Presumably, continuing with Sound Transit’s last Agency Progress Report 126.8 “full time monthly employees” were working on the Everett extension despite ridership for both the Northgate and Lynnwood extensions that was a fraction of projections.  Most of whom were bus riders forced to transfer from bus routes to light rail, doing nothing to reduce I-5 congestion into Seattle.

 

The Everett extension expenditures, a small part of the 1572 positions and $957.5 million budgeted for staffing in Sound Transits 2025 Proposed Budget and Financial Plan that doesn’t include funding for those driving or maintaining their light rail cars or buses,   

 

Neither Constantine nor the Board recognize the 2024 Starter Line and Lynnwood Link debut ridership results also debunked their “field of dreams approach” that extending light rail assures ridership.  Thus, not only should they not extend to Everett.  They should recognize that neither the Ballard to SODO or West Seattle to SODO light rail extension will attack the riders needed to justify the cost of creating the tracks and operating the trains.

 

The bottom line a competent transit system CEO would recognize a light rail spine for 4-car trains doesn’t have the capacity needed to reduce freeway congestion into Seattle.  That using light rail trains to replace bus routes reduces transit capacity along the entire route.  That having access to light rail doesn’t mean sufficient riders to justify spending billions boring a second tunnel under Seattle or second Duwamish Waterway Bridge,

 

That Constantine’s appointment assures Sound Transit continuing the “country’s largest transit system expansion” that doesn’t reduce roadway congestion.  That the area's taxpayers are getting very little from the $700 they currently pay for Sound Transit, a number Constantines appointment will increase.  The "likely" lack of riders with the Downtown Redmond extension in May and the results of Sound Transit continuing to use Line 2 trains for half the routes to Lynnwood this winter will be the next to validate the concerns.

 



Sunday, March 23, 2025

i-2022 Unconstitutional Benefits??

The March 22, Seattle Times headline “Washington’s natural gas initiative is unconstitutional, judge determines” heralds the judges claim “it makes it hard to say with any precision what the general topic is”.   Yet the  I-2022  voters approved included the following description.

 Every gas company or large combination utility shall provide natural gas to all persons and corporations in their service area even if other energy sources may be available


Thus, it would seem pretty “precise” as to the “initiative’s general topic” and not “an attempt to mislead voters with language that was confusing, harmful, and unconstitutional”.

 

That “it was opposed by those hoping to reduce Washington’s planet warming green- house gas emissions.”  Yet, prior to the Climate Commitment Acts passage in 2021 Washington’s CO2 made up only 1.56% of the country’s 11.19% of planets.  Thus, any climate benefits from rejecting the I-2022  was limited to reducing Washington’s 0.17456% of  global CO2 emissions. 

 

Even those benefits from no longer allowing natural gas in homes are further limited by Washington residential emissions being only 6.2 million metric tons (MMT) of the 74.4 MMT state total in 2022. Thus. any benefit from not allowing natural gas in future homes will do little to reduce Washington's “green-house” gas emissions.

 

The bottom line is the March 22nd article is another example of the Seattle Times abetting Washington residents being forced to pay so much for so little.




 

 

Monday, March 10, 2025

Sound Transit’s Real Complexity Problem

The March 7th Seattle Times Traffic Lab article “Report: Light rail too complex for its own good” details “operating problems associated with power problems, weak governance, inefficient use of maintenance crews, and a lack of crossover rail switches to avoid blockage”.  The problem apparently is due to the sensitivity of Sound Transit’s “Rail-to-Ground” selection for power system .  Proposed recommendations would allow trains to bypass problems and maintain Sound Transit’s promised four-minute-intervals in 2026.

This post opines the “Complexity” resulting from Sound Transit’s decision to route Line 2 trains through DSTT to Lynnwood and beyond dwarfs the power system problem.  Sound Transit currently routes Line 1 trains every 8 minutes between Angle Lake and Lynnwood. They could have “maintained the frequency of trains every four minutes that’s promised in 2026” by doubling the number of Line 1 trains. 

Instead, Sound Transit chose to provide additional trains to Lynnwood by routing Line 2 from Redmond via International District/CID station through DSTT and maintain current 8-minute intervals to Angle Lake and presumably to Federal Way when it debuts in 2026.

 The problem becomes how do they assure that Line 2 routes from Redmond arrive at International District/CID both 4 minutes before and after Line 1 routes from Angel Lake and later Federal Way?  Line 1 schedules show 36 minutes from International District/CID to and from Angle Lake.  The extension to Federal Way will add unknown minutes in both directions.

The current Line 2 schedule shows 17 minutes from Redmond Technology Center to South Bellevue T/C.  The extensions to Downtown Redmond and across I-90 bridge will add unknown time to the Line 2 route from International District/CID to and from Downtown Redmond.  Assuring the Line 1 and Line 2 trains arrive at the International District/CID 4 minutes apart constitutes a real Complexity problem.

It all could have been avoided if Sound Transit had simply doubled the Line 1 trains and terminated Line 2 at International District/CID.  Line 1 riders from South Seattle would’ve benefitted from additional capacity and Line 2 riders from service that matched east side demand.