My name is Bill Hirt and I'm a candidate to be a Representative from the 48th district in the Washington State legislature. My candidacy stems from concern the legislature is not properly overseeing the WSDOT and Sound Transit East Link light rail program. I believe East Link will be a disaster for the entire eastside. ST will spend 5-6 billion on a transportation project that will increase, not decrease cross-lake congestion, violates federal environmental laws, devastates a beautiful part of residential Bellevue, creates havoc in Bellevue's central business district, and does absolutely nothing to alleviate congestion on 1-90 and 405. The only winners with East Link are the Associated Builders and Contractors of Western Washington and their labor unions.

This blog is an attempt to get more public awareness of these concerns. Many of the articles are from 3 years of failed efforts to persuade the Bellevue City Council, King County Council, east side legislators, media, and other organizations to stop this debacle. I have no illusions about being elected. My hope is voters from throughout the east side will read of my candidacy and visit this Web site. If they don't find them persuasive I know at least I tried.

Wednesday, April 11, 2018

Dear Federal Highway Administration

(The below post, an email to the FHWA, was prompted by an April 10th Seattle Times Traffic Lab Article suggesting recent federal approval of bus line funding improved chances for Lynnwood extension funding. Hopefully they will demonstrate more competence than Sound Transit and Traffic Lab and reject the funding.  While doing so may not stop the extension it should be a wakeup call to supporters to end this stupidity.)

Dear Federal Highway Administration

The April 10th Seattle Times B1 page Traffic Lab article “Federal funding OK’d for bus line” suggests “Approval may be good news for other projects—like Lynnwood Link”. I urge you to reject Sound Transit’s application for $1.2 billion in FHWA money for the Lynnwood Link. Even with the federal grant local tax payers will still be required to pay close to $2B of the $3.1B for an extension that will do absolutely nothing to increase transit capacity into Seattle. 

Sound Transit refuses to recognize routing Central Link through the Downtown Seattle Transit Tunnel (DSTT) severely limits its capacity. A 2004 PSRC Technical Workbook,  “Central Puget Sound Region High Capacity Transit Corridor Assessment” concluded the DSTT station lengths limit trains to four cars and that safe operation requires a minimum of 4 minutes between trains, or 60 light rail cars per hour.  The PSRC Technical Workbook also concluded the capacity of the 74-seat light rail cars was limited to 148 riders for a total capacity through the tunnel into Seattle of 8880 riders per hour (rph). 

Light rail routed through the DSTT doesn’t have the capacity to justify Lynnwood extension.  Sound Transit’s 2017 4th Quarter weekday average boardings at UW and Capitol Hill totaled 17,487 commuters into Seattle to Westlake or University Stations in DSTT.  They plan to spend $2.1B on a Northgate light rail extension they’ve claimed would attract 15,000 daily riders.   Assuming half of the 15,000 Northgate Extension riders were also commuting into Seattle gives a total of nearly 25,000 every morning.  Accommodating their projected ridership into the DSTT with the Northgate Link and PSRC 8880 rph capacity will take nearly three hours.  

Sound Transit intends to use the federal funding as part of the $3.1 billion they plan to spend on a light rail extension beyond Northgate to Lynnwood that does nothing to increase the DSTT capacity.  Yet they justify the extension claiming it will add 68,500 daily riders, presumably adding 34,250 commuters into Seattle every morning.  Accommodating their projected Lynnwood extension ridership into the DSTT with the PSRC 8880 rph capacity will take nearly four hours, essentially ending access for other commuters into Seattle.  Even more absurd Sound Transit justified ST3 plans to spend billions more extending light rail to Everett with claims for an additional 37,000 riders.  Again assuming half do so every morning adds two hours of full trains before reaching Northgate. 

Clearly Sound Transit plans to spend $3.1 billion extending light rail to Lynnwood will reduce access to current Central Link riders as well as those added by the Northgate extension.  While FHWA rejection of Sound Transit’s application may not be “sufficient” to prevent them proceeding, approval will surely lead to their implementing not only the Lynnwood extension but also the extension to Everett. 

The entire area will pay a heavy price as a result.   Not only will it be burdened with the cost of paying for extensions that end access for many current and future riders, the operating costs for the longer routes will either require a huge increase in tolls for those able to ride or a financial “black hole” for the area's future transportation funds from the fare box revenue shortfall. 

Again, I urge you to reject Sound Transit’s application for Lynnwood extension.

Respectfully,
Bill Hirt
2615 170th Ave SE

Bellevue, WA 98008

Thursday, April 5, 2018

Seattle Needs More Public Transit not Tolls

The April 4th Seattle Times Traffic Lab article, “Mayor pushes for tolls downtown” exemplifies the inability of those responsible to recognize how to deal with the area’s congestion problem.  First of all, rather than trying to put tolls on roads leading into or in downtown Seattle they could simply increase parking fees in the area, especially during peak commute hours.   Those arriving after 10 a.m. would not face the additional charge.  Employers who provide parking would also be required to pay the parking fee surcharge for their employees.  

However, the problem with either tolls or increased parking fees is neither will likely change the need for commuters to drive into Seattle, they’ll simply increase the cost of doing so.  The way to reduce Seattle congestion is to offer commuters an alternative, namely more public transit.  While King County Metro could increase bus service within the city, Sound Transit could reduce congestion both within the city and along the routes into Seattle.

A 70-ft articulated bus can accommodate up to 119 sitting and standing riders.   Fifty additional buses an hour into Seattle from Everett and Federal Way along I-5, and from east side across I-90 Bridge could replace nearly 6,000 vehicles on each of the three routes into Seattle.  Two hours of increased bus service each morning would dramatically reduce Seattle congestion.

The added bus service would also reduce congestion on the routes into the city.  A typical freeway lane can accommodate about 2000 vehicles per hour at 45 mph.  Replacing 6,000 vehicles per hour with 50 buses would add the equivalent of 3 freeway lanes reducing congestion on the three major routes into Seattle.  The added capacity into Seattle would also likely reduce the housing "premium" commuters are willing to pay to live there. 

Mayor Durkan should use her influence to “dissuade” Sound Transit from continuing with plans to spend most of the $54 billion ST3 funds on a light rail spine that will do nothing to increase transit capacity into Seattle. (and nothing to reduce congestion.) Whatever riders the extensions add will simply displace those currently using light rail.  

Instead, over the last five years, Sound Transit has simply ignored the need to increase the area’s transit capacity.   Their Quarterly Ridership reported 115,163 4th quarter bus trips in 2012 only increased to 120,400 in the 2017 4th quarter.  That comparable total average express-bus-weekday boarding only increased from 54,345 to 61,526 during the five years.  The additional 300 morning and afternoon bus trips could more than double that ridership.

Not only do they need to increase bus service, they need to provide additional parking.  All the P&R lots with access to transit have been full for years, yet Sound Transit’s spent $6 billion on “System Expansions” with ~80 percent of that on light rail expansions, without adding a single major P&R with access to bus routes. They wait unto 2024 to begin adding a measly 8560 stalls by 2041. 

Rather than adding parking Sound Transit has proposed, “to better manage demand” at existing P&Rs.  These include having commuters pay to reserve a spot at an existing P&R and more recently subsidizing Lyft rides for Mercer Island commuters to and from their T/C.  Neither will provide the needed additional capacity.

Again, reducing congestion in Seattle requires reducing the number of vehicles entering the city.  Forcing commuters to pay tolls or higher parking without offering them increased public transit as an alternative only adds to their cost and does nothing to reduce congestion.  They need more transit capacity and parking.

Sound Transit should be “encouraged” to quickly add more bus routes, especially to areas with large numbers of new apartments and condominiums.  Those working in Seattle should be surveyed to determine when and where to route the buses.  Commuters could pay a “ride assurance fee” to guarantee a seat on their preferred route sufficient to provide Sound Transit's typical 35% recovery of operating costs, allowing others to ride free.

The survey results could also identify locations for added parking.  The new parking could be “Pay-to-Park” where commuters could pay monthly or annual fees to reserve a parking space and access to a preferred route that again cover 35% of operating costs, allowing others to ride free.

The bottom line is Seattle’s current congestion, along with congestion on the roads into the city, is largely the result of Sound Transit’s five-year failure to increase public transit capacity into the city.  The billions they intend to spend on light rail spine will do nothing to increase that capacity. 


Again, Mayor Durkan needs to recognize that tolls are "unlikely" to reduce Seattle congestion and that she should use her influence to “persuade” Sound Transit to add more transit capacity rather than extend light rail spine.

Monday, April 2, 2018

Mercer Island Needs Pay-to-Park, Not Lyft

The March 29th Seattle Times Traffic Lab article describing Sound Transit plans to subsidize Lyft connections to the Mercer Island T/C is another result of Sound Transit’s decision to “manage demand” at existing P&R lots rather than to ”increase parking supply”.   Last month their “manage-demand” approach entailed allowing solo-drivers reserve stalls at existing P&Rs.  It’s unlikely they will proceed with widespread use of that plan since those wanting to reserve parking for later commutes will fill all the available parking, eliminating access for those currently using P&R.

Todd Kelsey, Lyft’s general manager for the Northwest suggested the Mercer Island adopt the subsidized “ride hail” approach in 2015.  Lyft and Uber each contributed $10,000 towards the up to $226,900 Sound Transit will give Mercer Island to subsidize the ride-hail fares.  One can understand why they did so claiming “In the six-month pilot, we expect it to be thousands of rides.”   Especially since Sound Transit is considering “At least 26 other park and ride facilities in King County are chronically full, so these kinds of arrangements might spread”. 

The discounted rides begin April 23. Islanders can catch a car to or from their transit hub for $2 the first three months. During months four to six, the rate is $2 per rider for a group ride, $5 per solo ride.  It’s unclear how many rides the $226,900 will subsidize or what fares will be without subsidies.  Mercer Island Mayer Debbie Berlin “embraced the opportunity to investigate the future of transportation with this pilot project”.  Ross Freeman, city sustainability manager, claimed the “Mercer Island City Council Members didn’t fret about subsidizing ride-hailing markets, (Presumably unsubsidized ride-hailing is also ok.)

However, it’s not clear why Mercer Island commuters will be enamored with the idea of paying probably $10 or more to ride to and from their T/C.  They’ve already been forced to pay, likely more than most, increased car tab and property taxes to fund ST3.  Also, many won't welcome waiting for Lyft or Uber to pick them up at home or the hassle of waiting with hundreds of commuters at the T/C attempting to “hail a ride” home.

Mercer Island commuters deserve better from their city leaders.  The council could require Sound Transit allow Islanders the opportunity to reserve a parking stall at the Mercer Island T/C, similar to what they’d proposed in February.  Especially since it was Sound Transit’s closure of the South Bellevue P&R that forced many I-90 corridor commuters to use their T/C. 

The most absurd rational for the “ride hail” approach is the Traffic Lab claim “Taxpayers may benefit, if transit agencies avoid parking-structure expansions that can cost around $100,000 a space".  They profess concerns about tax payers having to pay to construct parking yet ignore Sound Transit plans to spend $54 billion of their tax money on light rail extensions they’ve already conceded won’t reduce congestion.

The best option would be for the council to “persuade” Sound Transit to construct a 1000-stall Pay-to-park lot at their Island Crest Park.   The ability to use existing space for parking would likely substantially reduce the costs.  Residents could pay a monthly or annual fee of $10 per weekday to reserve a space.  The $10,000 daily fees would be used to cover Sound Transit’s express bus operating costs allowing others to ride free.

Rather than providing access to T/C, the buses could provide express routes into Seattle and Bellevue with round trips to 4th and University, or Bellevue T/C, both approximately 16 miles.  Sound Transit budgets bus operating costs as ~$10 per mile or $160 per round trip.  $56 in fares per trip would provide Sound Transit’s typical 35% of operating costs.   Thus the $10,000 could cover 178 round trips or 89 morning and afternoon commutes. 

A typical 40-ft bus can accommodate up to 75 sitting and standing riders.  The 89 round trips each morning and afternoon would provide capacity for 6675 commuters to and from the two destinations.  Those paying the tolls would have priority access to the bus route of their choice, however an additional 5675 could ride free, exceeding likely demand.   Their only need being to get to and from the Pay-to-Park lot.

The trips could be scheduled to meet demand with buses departing every 5 minutes to one of the two destinations during peak commute with 10-minute intervals during off-peak.  The afternoon return schedules would be similar.  Drop-offs in Seattle would be limited to one or two designated locations for each route but pick ups will be limited to one location to assure those paying for parking would have access to their preferred routes.

Pay-to-Park will be especially useful to Mercer Island commuters as congestion increases on bridge. Sound Transit intends to use East Link to replace many of the I-90 corridor bus routes reducing Islander access to buses.  East Link's limited capacity, at least during peak commute, will likely be full when they arrive at Mercer Island Station.  Mercer Island can surely justify having Sound Transit acquire a few more buses since there would be no East Link without their approval of the Shoreline and Construction permits that allowed it to proceed.

Monday, March 26, 2018

Traffic Lab Condones Lynnwood Extension Insanity



The Seattle Times March 23rd B1 page Traffic Lab article, “Lynnwood light rail could be a budget beneficiary” is hardly the good news suggested by the article.  Even with the federal grant local tax payers will be required to pay close to $2B of the $3.1B extension that will do absolutely nothing to increase transit capacity into Seattle.  Neither Sound Transit, nor apparently the Seattle Times Traffic Lab, recognizes routing Central Link through the Downtown Seattle Transit Tunnel (DSTT) severely limits its capacity.

A 2004 PSRC Technical Workbook,  “Central Puget Sound Region High Capacity Transit Corridor Assessment” concluded the DSTT station lengths limit trains to four cars and that safe operation requires a minimum of 4 minutes between trains, or 60 light rail cars per hour.  The PSRC Technical Workbook also concluded the capacity of the 74-seat light rail cars was limited to 148 riders for a total capacity through the tunnel from Everett into Seattle of 8880 riders per hour (rph); a fraction of the transit capacity required to reduce congestion.

Sound Transit initially sold light rail as a link between UW and Tukwila with an early extension to SeaTac.  At the time they projected 70,000 of the projected 110,000 riders would come from the University Link.  A University T/C would provide an interface between 520 BRT and light rail, benefitting commuters from both sides of the lake. It included a 2nd Montlake Cut Bridge to facilitate BRT service.  Terminating BRT routes at the UW would have allowed light rail to eliminate most if not all of the 520 bus routes into Seattle with the return routes providing Seattleites with light rail/BRT connections to Microsoft and Bellevue.   

Instead Sound Transit used purported UW objections to eliminate the T/C at the UW stadium parking lot, the 2nd Montlake Cut Bridge, and extend light rail to Northgate.  They plan to spend $2.1B on the extension they’ve claimed would attract 15,000 daily riders, a fraction of what the UW T/C would have provided.  Especially since large numbers of commuters would use T/C BRT connections in both directions.  

Sound Transit’s 2017 4th Quarter weekday average boardings at UW and Capitol Hill totaled 17,487 with most presumably morning commuters into Seattle to Westlake or University Stations in DSTT.  Assuming half of the 15,000 Northgate Extension riders were also commuting into those stations in Seattle (again very few will likely commute to Northgate in the morning) gives a total of nearly 25,000 every morning.  Accommodating their projected ridership into the DSTT with the Northgate Link and PSRC 8880 rph capacity will take nearly three hours.  

Surely Sound Transit’s decision to spend $3.1 B extending light rail beyond Northgate to Lynnwood is absurd.  Yet the Traffic Lab article gives credence to Sound Transit claim the extension will add 68,500 daily riders, presumably adding 34,250 commuters into Seattle every morning.  (They fail to mention the additional 37,000 riders Sound Transit claims they'll get from the billions spent on Everett extension.)


The Seattle Times describes Traffic Lab as a “project that digs into the regions thorny transportation issues”.  It doesn’t take much “digging” to recognize it will take nearly 4 hours for light rail to accommodate just the Lynnwood Link riders every morning.  Most would consider that a “thorny transportation issue” worthy of mention in article. 

Friday, March 16, 2018

Five Years of Public Transit Failure are Enough

The end of the 2018 legislative session marks another year of the House and Senate Transportation Committee’s feckless response to the area’s roadway gridlock.   Clearly neither Rep. Judy Clibborn, the chair of the House Transportation Committee, nor Sen. Steve Hobbs, the head of the Senate Transportation Committee, had any interest in legislation requiring Sound Transit be audited. Any competent audit would surely have exposed the total failure of Sound Transit policies to reduce area’s congestion.  (They even managed to avoid passing the well-deserved car tab reduction despite having control of both house and senate.)

For example, the Sound Transit Staff recently responded to a 2012 Board request “to update the agency’s parking policy” to “better manage demand at the regions park-and-rides”.  It consisted of proposing a “parking-permit program that would allow solo drivers to pay for a reserved space at selected transit facilities”.  Apparently neither the Sound Transit Board in 2012 nor their Staff by 2018 recognized that the best way to “update the agency’s parking policy” was to add more parking.   As a result, it’s been five years of public transit failure that’s likely to continue. 

All the P&R lots with access to transit have been full for years, yet Sound Transit didn’t recognize the need to add parking in 2012 and still hasn’t done so.   During the last five years they’ve budgeted nearly $6 billion on “System Expansions” with ~80 percent of that on light rail expansions, without including a single major P&R with access to bus routes.   The $6 billion already spent is but a tiny fraction of the billions Sound Transit has already dedicated to creating their light rail spine.  Yet they wait unto 2024 to begin adding a measly 8560 stalls by 2041. 

Sound Transit’s failure to add parking goes along with their failure to increase the number of bus trips.  Their Quarterly Ridership reports showed 2012, 4th quarter bus trips, 115,163, had increased to only 120,400 during the 2017 4th quarter.   Clearly, Sound Transit has shown little interest in increasing public transit “supply”.  It’s no wonder comparable total average express-bus-weekday boarding only increased from 54,345 to 61,526 during the five years.  

Sound Transit’s five-year failure to increase public transit capacity is reflected in Puget Sound Regional Council’s “Stuck in Traffic: 2015 Report”.  It included a chart showing the 32,700 hours of delay in 2014 represented a 52% increase in delays between 2009 and 2014.  A more recent Feb 12th, 2018 Seattle Times Traffic Lab article reported 2016 traffic delays were nearly 2.5 times the 2009 levels. 

The article reported between Everett and Seattle, “you had to budget 94 minutes to drive alone during the morning commute, an increase of nine minutes over the 2014 commute”.   A clear result of Sound Transit failure to increase public transit supply between the two with 4th Quarter 2012 weekday boarding, 8460, increasing to only 8472 in 2017 4th Quarter.  

Sound Transit’s decision in 2012 to “manage demand” rather than increase supply has resulted in five years of increased not decreased congestion.  Their current plans to spend  $54 billion on a light rail spine routed through the Downtown Seattle Transit Tunnel will only continue that trend.

The Sound Transit Board needs to be "persuaded" to increase public transit supply.   One way to do so is with new P&R lots where commuters pay to reserve a stall with assured access to a free ride on their preferred bus route into Seattle.  Those paying the fees needed to cover Sound Transits normal 35% of operation costs would allow others to ride free.  For example, the 12/03/17 post detailed how parking fees from three 1000-stall Pay-to-Park lots near Lynnwood ($10) and two near Everett ($15) could provide 20,000 more commuters with daily public transit capacity into and out of Seattle.  

For $350 million (assuming  $50,000 per parking stall and $100 million for buses) Sound Transit could add the equivalent of 4-5 lanes of capacity during peak commute between Everett and Seattle.  The I-5 corridor South of Seattle and I-90 corridor to Issaquah could also benefit from Pay-to-Park.  And they could begin doing so in 3 to 4 years for a fraction of the money they’ll spend on light rail spine.

The PSRC 2015 report showed HOV lane congestion between Everett and Seattle had increased travel times to 75 minutes in 2014.  Those travel times have surely increased along with the recent drive-alone travel times.  The travel times for the increased public transit supply could be minimized by limiting an HOV lane to buses only or +3HOV during peak commute.  If needed, HOT lanes could be implemented with fees set to limit non-transit traffic to maintain 45 mph.  The benefits from potentially 20,000 fewer vehicles would more than offset the loss of +2HOV lane.

Each Pay-to-Park lot would have a non-stop BRT route into Seattle.  4th Ave could be converted into an elongated T/C to facilitate egress and access with designated drop-off and pick-up locations on opposite sides depending on the route. While there could be two drop off locations there would be only one pick up location to assure those paying for parking would have access. 


It’s bad enough Sound Transit’s 2012 decision to “manage demand” rather than increase public transit supply has already resulted in five years of increased congestion.  It’s insanity to allow them to spend years and billions more on light rail extensions that do nothing to increase public transit supply into Seattle and only add to the congestion.  

Monday, March 5, 2018

Sound Transit Problems Way Beyond CEO Rogoff’s “Management Style”

The Seattle Times March 2nd BI page article “Sound Transit chief denied bonus over management style” is just the “tip of the iceberg when it comes to CEO Rogoff’s “deficiencies”.  However, the area should be far more concerned about Sound Transit board's approach to public transit than with Rogoff's "east coast attitude and leadership style".  It’s not clear what his background was that led to his previous position as Under Secretary of Transportation for Policy in the U.S. Department of Transportation. County Executive Dow Constantine’s decision to hire him as Sound Transit CEO was presumably based on this background though others may conclude he was hired as a “reward” for the $1.2 B Lynnwood federal grant while there. 

Whatever his  background, anyone with a modicum of public transit competence would have recognized extending light rail that was routed through the Downtown Seattle Transit Tunnel  (DSTT) does nothing to increase its limited capacity into the city.   Constantine’s decision to hire Rogoff, while maybe not a reward, is because his Lynnwood federal grant “suggested”  a willingness to go along with the extensions.

Constantine’s faith in Rogoff has certainly been “rewarded”.    Rogoff was instrumental in getting ST3 passed. (He also hosted a campaign soiree where "would be" benefactors from the billions spent on ST3 likely contributed to Constantine's $1 million County Executive campaign fund.)  He managed to convert  legislation enabling 15 years of billion dollar tax increases to at least 30 years with no limit on further extensions.  Sound Transit, under his leadership, “misled” voters about car tab fees with a Sound Transit 7/8/2016 post claiming:

An adult owning the median value motor vehicle would pay an additional $43 per year in MVET if ST3 were passed.

 Sound Transit subsequently deleted the post and responded to later complaints about car tab fees, some more than ten times the $43 promised, with the following:

During the campaign, Sound Transit was completely transparent about the taxes. We all knew that our car tabs would increase a lot in 2017 to help fund Sound Transit.

Clearly, Rogoff’s Sound Transit not only “misled” voters about car tab costs prior to the vote, they lied about doing so afterwards.  Also, their claims for ST3 ridership prior to the vote were sheer fantasy. The PSRC 2004 Technical Workbook,  “Central Puget Sound Region High Capacity Transit Corridor Assessment” concluded the DSTT station lengths limit trains to four cars and that safe operation requires a minimum of 4 minutes between trains, or 60 light rail cars per hour.  The PSRC Technical Workbook also concluded the capacity of the 74-seat light rail cars was limited to 148 riders for a total capacity of 8880 riders per hour (rph).  

Yet prior to the 2016 ST3 vote the Sound Transit 3 map detailing expansions claimed extending light rail from Northgate to Everett would increase ridership by up to 119,000 daily.  Assuming PSRC capacity, it would take more than 13 hours each day to accommodate the 119,000 riders.  Needless to say those attempting to get on Central Link at Northgate and stations nearer Seattle would have a “long wait”.

The ST3 extensions to Tacoma and Bellevue would presumably share the DSTT capacity, each with 4440-rph capacities.  The Sound Transit 3 Map claimed the extensions beyond Angel Lake would attract up to 95,000 daily riders.  That would take more than 21 hours each day. Again, current Central Link riders would have a long wait for available space.  The wait at Mercer Island to accommodate the  50,000 daily riders they’ve promised for East Link would “only take” 11 hours.

The bottom line is Sound Transit, under Rogoff’s leadership, used blatant mendacity regarding ST3 cost and benefits to get voter approval of the light rail spine funding.   However, anyone qualified to be on a “transportation system board” should have recognized that reality.  The problem is Dow Constantine and the Sound Transit Board have always been more interested in creating a light rail system than in increasing the public transit capacity needed to reduce congestion. Rogoff’s success in getting ST3 passed went a long way towards funding those light rail extensions that don't.  

Whatever “penalties” the board decides for Rogoff’s “management style” will do nothing to change the fact they’re committing to spend $54 billion over 25 years on a light rail spine that will do absolutely nothing to reduce congestion and whose operating costs will likely create a financial black hole for the area's future transportation funds.


That’s why the legislature should be requiring an audit and what the media should be warning the area about.  If past is prolog that’s not likely to happen and the entire area will pay.

Thursday, March 1, 2018

Sound Transit Should Increase “Transit Supply” Not “Manage Demand”.

The Feb 14th Sound Transit news release “Sound Transit, King County Metro seek public feedback on reserved solo-driver permit parking at transit facilities” exemplifies their inept approach to public transit.  The proposal was the result of a 2012 Sound Transit Board of Directors request asking  “staff to update the agency’s parking policy and develop a pilot project to test new parking management strategies”.  Apparently it took the staff six years to come up with the following:

To better manage demand at the region’s park-and-rides and transit centers, Sound Transit and King County Metro are seeking feedback on a parking permit program that would allow solo drivers to pay for a reserved space at select transit facilities.

While reserved parking may better “manage demand” for existing bus service, it will do nothing to reduce roadway congestion. The area’s P&R lots with access to transit have been full for years. Those currently using the P&R who are “displaced” by the “new parking management strategy” will presumably add to those commuting into Seattle. Not only will they be forced to endure the cost and hassle of commuting into Seattle, they'll likely be forced to pay a hefty parking fee there.  Commuters wishing to avoid the hassle and cost will be faced with a choice between either arriving at the P&R “very early” or paying for reserved parking.  The reserved parking stalls will “likely” be very popular.  Who decides who gets to buy one?

Sound Transit’s justifies the “new parking management strategy” with the following:

At the most popular transit facilities, people are arriving earlier and earlier to secure a space – which can increase crowding on early buses and trains while seats remain empty on later transit trips.

Anyone with a modicum of competence would recognize that transit systems can’t “manage transit demand”.  The solution to the “increasing crowding on early buses” should be to add more bus routes.  That, “the seats remain empty on later transit trips” because all the P&Rs with access to the buses are full before many commuters can use them.   Yet Sound Transit refuses to add either bus routes or additional parking. 

The Sound Transit Board needs to recognize that, rather than attempting to “manage demand” for public transit, they need to “increase supply”.  Doing so requires adding parking with access to increased capacity with more bus routes.  Yet Sound Transit waits until 2024 to begin adding a measly 8560 parking spaces by 2041.  The billions they’re planning to spend on the STE “Prop 1 and beyond” light rail spine will do absolutely nothing to increase transit capacity into Seattle. 

The way to increase public transit “supply” is to create new P&R lots where commuters pay to reserve a stall with assured access to a free ride on their preferred bus route into either Seattle or Bellevue. The 12/03/17 post detailed how the parking fees from three 1000-stall Pay-to-Park lots near Lynnwood ($10) and two near Everett ($15) would allow 20,000 more commuters to use public transit into and out of Seattle each day. 

Another way to increase “transit supply” is to route buses directly to a stop within walking distance of the many new large apartment and condominium complexes throughout the area.   Commuters there could pre-pay a “ride assurance” fee to reserve a seat on their preferred bus route. 

The bottom line is a competent Sound Transit Board would've never proposed Prop 1, extending light rail routed through the Downtown Seattle Transit Tunnel.  That four years later they still hadn't  recognized that reducing congestion required increasing public transit “supply” rather than  “managing demand” for existing public transit.  That,  spending billions on light rail extensions does nothing to increase transit capacity (supply) into Seattle.  That a fraction of that money could have been spent adding parking and bus service that would have minimized the areas “4th worst-in-country congestion”. 

Their latest news release suggests they still don’t recognize that reality.